厂商 :山东省济宁恒旺工矿机械有限公司
山东 济宁- 主营产品:
- 钻采设备
- 探水钻机
- 凿岩机械
恒旺厂家直销HWZGX-390L履带压桩机360°旋转压桩机
产品信息Product information:
液压旋转按桩机,是我厂为了适应市场发展需要,拓宽施工领域所精心研发的一款机型,较轮式打桩机来讲,场地的适应性更强,作业面更宽。经过了大量的理论推敲和实地认证,目前各项技术指标均已达到业内产品相关标准,为规范操作,确保钻机正常运转,请操作人员务必按以下规程步骤进行操作
Hydraulic rotary press machine, in order to meet the needs of market development, this factory is broaden the research field of the construction of a model, the wheel driver, stronger adaptability, operation is more wide.After a great deal of theoretical elaboration and field certification, is currently the technical indicators have reached the industry product standards, to regulate the operation, ensure the normal working of drilling rig, please make sure that the operator steps to operate in accordance with the following procedures
一、启动前检查工作
1、检查发动机机油、液压系统液压油、柴油等的油位是否达到工作要求,如油位不足,应及时添加,防止工作中因缺油而导致设备异常;
2、检查动力装置、行走部分、锤头、滑道、滑道支架等各主要机械部位螺栓连接是否有松动,及时紧固松动的螺栓,防止工作中发生意外;
3、检查各液压油缸、转动轴处的开口销是否正常,应及时更换磨损严重的开口销;
4、仔细观察设备周圈环境,确保按桩机工作半径内无行人及障碍物。
First, before the start of
inspection
1, check the engine oil and hydraulic system
of hydraulic oil, diesel oil level whether meet the job requirements, such as
the oil level is not enough, should be added in time, prevent work caused by
lack of oil equipment abnormal;
2, check the power device, walking part,
hammer head, slide, slide support the main mechanical parts such as bolts
connection are loose, tighten bolt looseness, in time to prevent an accident at
work;
3, check the hydraulic oil cylinder, the axis
of rotation of the split pin is normal, should be timely replacement of worn
split pin;
4, careful observation equipment
circumferential environment, to ensure the pile machine working radius no
pedestrians and obstacles.
二、启动发动机
打开发动机组电源输出开关,旋转发动机钥匙,按下一键启动按钮,启动柴油机组。液压泵随发动机开始工作,怠速运转3~5分钟,逐渐加大供油量,使液压泵达到额定压力20Mpa,并固定好油门调节手柄。
Second, start the engine
Open the engine unit output power switches,
rotary engine key, a key to press the start button, to start the diesel
generator.Hydraulic pump with the engine start working, idle running 3 ~ 5
minutes, gradually increasing oil, make the hydraulic pump to achieve the rated
pressure 20 mpa, and fixed throttle regulating handle.
三、移机至工作位置
1、仔细查看换向阀操作指示牌中各操作杆所对应机能,并熟记在心。严禁胡乱推动操作阀杆。
2、推动zuo轮行走、右轮行走阀杆,将设备移动至指定位置,并找好桩位。
3、推动大臂阀杆,升起大臂,调整大臂角度,使大臂达到工作要求。升起大臂过程中,应时刻观察滑道底端立柱与地面是否接触。若底端立柱触及地面,应推动滑道阀杆,向上提升滑道。
4、根据工作需要,可推动摇臂阀杆,使大臂左右摆动,调整至所需位置;
5、调整好位置后,应推动滑道阀杆,使滑道向下滑动,将滑道底端立柱插入地面。全部调整完毕后开始按桩工作。
Third, moving to the working
position
1, take a closer look at the reversing valve
operation sign by the lever of the corresponding function, and remember in
mind.It is forbidden to careless driving operation of valve stem.
2, promote zuo round to walk, walk right wheel
stem, move the equipment to the specified location, and find good pile
location.
3, promoting stem, large arm raised arm,
adjust the Angle of the big arm, arm can meet the job requirements.Rise in the
process of the big arm, at all times observe the chute bottom column if contact
with the ground.If the bottom of the column touches the ground, should push the
slide valve rod, upward ramp.
4, according to the requirements of the job,
can promote the rocker stem, make big arm swinging, adjusted to the desired
location;
5, after adjust position, should push the
slide valve rod, make the slide downward slide, insert the chute bottom pillar
on the ground.After all adjustments according to the pile work.
四、按桩工作
1、推动钻杆上下阀杆,将锤头提升至最高位置;
2、将矩形桩放入桩杆支撑内部,矩形桩放置稳定后,推动锤头阀杆,使锤头开始冲击工作。慢慢推动钻杆阀杆,使锤头慢慢向下移动,使桩帽插入矩形桩内部。
3、锤头正常冲击工作情况下,慢慢向下推动锤头,将矩形桩按入地面至要求深度。
Fourth, according to the pile
work
1, the push rod up and down the stem, hammer
head up to the highest position;
2, the rectangle pile into the rod support
inside, rectangle pile placed after stability, promote hammer stem, make the
impact hammer head began to work.Slowly push the drill stem, make the hammer
head slowly moves down, the rectangular pile and pile cap insert inside.
3, hammer impact work normally, slowly push
down hammerhead, rectangle pile in the ground to the required depth.
产品参数:
型号Model |
HWZGX-390L |
锤头型号 Hammer Model |
390 |
钎杆直径Rod Diameter /mm |
0-400 |
双联齿轮泵压力 Duplex gear pump pressure(mpa) |
20 |
双联齿轮泵排量Duplex gear pump displacement(ml/r) |
40 |
液压系统压力hydraulic system pressure(mpa) |
20 |
整机重量 Overall Machine weight /T |
5.8 |
80 |
旋转角度 rotation angle /° |
360 |
旋转半径 rotation semi diameter/mm |
1925 |
有效按桩行程 Effective press pile stroke/mm |
0-3000 |
外形尺寸dimension(LXWXH)(长×宽×高)/mm |
4650×2150×2700 |
履带板track shoe(mm) |
350 |
行走马达总排量Walking motor total emissions (ml/n) |
1575 |
行走马达额定压力Walking motor rated pressure(mpa) |
18 |
行走马达输出扭矩 walking motor output torque(n.m) |
4300 |
行走马达转速walking motor rotation(r/min) |
50 |
恒旺厂家直销HWZGX-390L履带压桩机360°旋转压桩机
产品信息Product
information:
液压旋转按桩机,是我厂为了适应市场发展需要,拓宽施工领域所精心研发的一款机型,较轮式打桩机来讲,场地的适应性更强,作业面更宽。经过了大量的理论推敲和实地认证,目前各项技术指标均已达到业内产品相关标准,为规范操作,确保钻机正常运转,请操作人员务必按以下规程步骤进行操作
Hydraulic rotary press machine,
in order to meet the needs of market development, this factory is broaden the
research field of the construction of a model, the wheel driver, stronger
adaptability, operation is more wide.After a great deal of theoretical
elaboration and field certification, is currently the technical indicators have
reached the industry product standards, to regulate the operation, ensure the
normal working of drilling rig, please make sure that the operator steps to
operate in accordance with the following procedures
一、启动前检查工作
1、检查发动机机油、液压系统液压油、柴油等的油位是否达到工作要求,如油位不足,应及时添加,防止工作中因缺油而导致设备异常;
First, before the start of
inspection
二、启动发动机
打开发动机组电源输出开关,旋转发动机钥匙,按下一键启动按钮,启动柴油机组。液压泵随发动机开始工作,怠速运转3~5分钟,逐渐加大供油量,使液压泵达到额定压力20Mpa,并固定好油门调节手柄。
Second, start the engine
三、移机至工作位置
1、仔细查看换向阀操作指示牌中各操作杆所对应机能,并熟记在心。严禁胡乱推动操作阀杆。
Third, moving to the working
position
四、按桩工作
Fourth, according to the pile
work
产品参数:
型号Model
HWZGX-390L
锤头型号 Hammer Model
390
钎杆直径Rod Diameter /mm
0-400
双联齿轮泵压力 Duplex gear pump pressure(mpa)
20
双联齿轮泵排量Duplex gear pump displacement(ml/r)
40
液压系统压力hydraulic system pressure(mpa)
20
整机重量 Overall Machine weight /T
5.8
80
旋转角度 rotation angle /°
360
旋转半径 rotation semi diameter/mm
1925
有效按桩行程 Effective press pile stroke/mm
0-3000
外形尺寸dimension(LXWXH)(长×宽×高)/mm
4650×2150×2700
履带板track shoe(mm)
350
行走马达总排量Walking motor total emissions (ml/n)
1575
行走马达额定压力Walking motor rated pressure(mpa)
18
行走马达输出扭矩 walking motor output torque(n.m)
4300
行走马达转速walking motor rotation(r/min)
50
2、检查动力装置、行走部分、锤头、滑道、滑道支架等各主要机械部位螺栓连接是否有松动,及时紧固松动的螺栓,防止工作中发生意外;
3、检查各液压油缸、转动轴处的开口销是否正常,应及时更换磨损严重的开口销;
4、仔细观察设备周圈环境,确保按桩机工作半径内无行人及障碍物。
1, check the engine oil and hydraulic system
of hydraulic oil, diesel oil level whether meet the job requirements, such as
the oil level is not enough, should be added in time, prevent work caused by
lack of oil equipment abnormal;
2, check the power device, walking part,
hammer head, slide, slide support the main mechanical parts such as bolts
connection are loose, tighten bolt looseness, in time to prevent an accident at
work;
3, check the hydraulic oil cylinder, the axis
of rotation of the split pin is normal, should be timely replacement of worn
split pin;
4, careful observation equipment
circumferential environment, to ensure the pile machine working radius no
pedestrians and obstacles.
Open the engine unit output power switches,
rotary engine key, a key to press the start button, to start the diesel
generator.Hydraulic pump with the engine start working, idle running 3 ~ 5
minutes, gradually increasing oil, make the hydraulic pump to achieve the rated
pressure 20 mpa, and fixed throttle regulating handle.
2、推动zuo轮行走、右轮行走阀杆,将设备移动至指定位置,并找好桩位。
3、推动大臂阀杆,升起大臂,调整大臂角度,使大臂达到工作要求。升起大臂过程中,应时刻观察滑道底端立柱与地面是否接触。若底端立柱触及地面,应推动滑道阀杆,向上提升滑道。
4、根据工作需要,可推动摇臂阀杆,使大臂左右摆动,调整至所需位置;
5、调整好位置后,应推动滑道阀杆,使滑道向下滑动,将滑道底端立柱插入地面。全部调整完毕后开始按桩工作。
1, take a closer look at the reversing valve
operation sign by the lever of the corresponding function, and remember in
mind.It is forbidden to careless driving operation of valve stem.
2, promote zuo round to walk, walk right wheel
stem, move the equipment to the specified location, and find good pile
location.
3, promoting stem, large arm raised arm,
adjust the Angle of the big arm, arm can meet the job requirements.Rise in the
process of the big arm, at all times observe the chute bottom column if contact
with the ground.If the bottom of the column touches the ground, should push the
slide valve rod, upward ramp.
4, according to the requirements of the job,
can promote the rocker stem, make big arm swinging, adjusted to the desired
location;
5, after adjust position, should push the
slide valve rod, make the slide downward slide, insert the chute bottom pillar
on the ground.After all adjustments according to the pile work.
1、推动钻杆上下阀杆,将锤头提升至最高位置;
2、将矩形桩放入桩杆支撑内部,矩形桩放置稳定后,推动锤头阀杆,使锤头开始冲击工作。慢慢推动钻杆阀杆,使锤头慢慢向下移动,使桩帽插入矩形桩内部。
3、锤头正常冲击工作情况下,慢慢向下推动锤头,将矩形桩按入地面至要求深度。
1, the push rod up and down the stem, hammer
head up to the highest position;
2, the rectangle pile into the rod support
inside, rectangle pile placed after stability, promote hammer stem, make the
impact hammer head began to work.Slowly push the drill stem, make the hammer
head slowly moves down, the rectangular pile and pile cap insert inside.
3, hammer impact work normally, slowly push
down hammerhead, rectangle pile in the ground to the required depth.