光伏压桩机

厂商 :山东省济宁恒旺工矿机械有限公司

山东 济宁
  • 主营产品:
  • 钻采设备
  • 探水钻机
  • 凿岩机械
联系电话 :15963776772
商品详细描述

恒旺厂家直销HWZGX-390L履带压桩机360°旋转压桩机

产品信息Product information

液压旋转按桩机,是我厂为了适应市场发展需要,拓宽施工领域所精心研发的一款机型,较轮式打桩机来讲,场地的适应性更强,作业面更宽。经过了大量的理论推敲和实地认证,目前各项技术指标均已达到业内产品相关标准,为规范操作,确保钻机正常运转,请操作人员务必按以下规程步骤进行操作

Hydraulic rotary press machine, in order to meet the needs of market development, this factory is broaden the research field of the construction of a model, the wheel driver, stronger adaptability, operation is more wide.After a great deal of theoretical elaboration and field certification, is currently the technical indicators have reached the industry product standards, to regulate the operation, ensure the normal working of drilling rig, please make sure that the operator steps to operate in accordance with the following procedures

一、启动前检查工作

1、检查发动机机油、液压系统液压油、柴油等的油位是否达到工作要求,如油位不足,应及时添加,防止工作中因缺油而导致设备异常;
2
、检查动力装置、行走部分、锤头、滑道、滑道支架等各主要机械部位螺栓连接是否有松动,及时紧固松动的螺栓,防止工作中发生意外;
3
、检查各液压油缸、转动轴处的开口销是否正常,应及时更换磨损严重的开口销;
4
、仔细观察设备周圈环境,确保按桩机工作半径内无行人及障碍物。

First, before the start of inspection
1, check the engine oil and hydraulic system of hydraulic oil, diesel oil level whether meet the job requirements, such as the oil level is not enough, should be added in time, prevent work caused by lack of oil equipment abnormal;
2, check the power device, walking part, hammer head, slide, slide support the main mechanical parts such as bolts connection are loose, tighten bolt looseness, in time to prevent an accident at work;
3, check the hydraulic oil cylinder, the axis of rotation of the split pin is normal, should be timely replacement of worn split pin;
4, careful observation equipment circumferential environment, to ensure the pile machine working radius no pedestrians and obstacles.

二、启动发动机

 打开发动机组电源输出开关,旋转发动机钥匙,按下一键启动按钮,启动柴油机组。液压泵随发动机开始工作,怠速运转3~5分钟,逐渐加大供油量,使液压泵达到额定压力20Mpa,并固定好油门调节手柄。

Second, start the engine
Open the engine unit output power switches, rotary engine key, a key to press the start button, to start the diesel generator.Hydraulic pump with the engine start working, idle running 3 ~ 5 minutes, gradually increasing oil, make the hydraulic pump to achieve the rated pressure 20 mpa, and fixed throttle regulating handle.

三、移机至工作位置

1、仔细查看换向阀操作指示牌中各操作杆所对应机能,并熟记在心。严禁胡乱推动操作阀杆。
2
、推动zuo轮行走、右轮行走阀杆,将设备移动至指定位置,并找好桩位。
3
、推动大臂阀杆,升起大臂,调整大臂角度,使大臂达到工作要求。升起大臂过程中,应时刻观察滑道底端立柱与地面是否接触。若底端立柱触及地面,应推动滑道阀杆,向上提升滑道。
4
、根据工作需要,可推动摇臂阀杆,使大臂左右摆动,调整至所需位置;
5
、调整好位置后,应推动滑道阀杆,使滑道向下滑动,将滑道底端立柱插入地面。全部调整完毕后开始按桩工作。

Third, moving to the working position
1, take a closer look at the reversing valve operation sign by the lever of the corresponding function, and remember in mind.It is forbidden to careless driving operation of valve stem.
2, promote zuo round to walk, walk right wheel stem, move the equipment to the specified location, and find good pile location.
3, promoting stem, large arm raised arm, adjust the Angle of the big arm, arm can meet the job requirements.Rise in the process of the big arm, at all times observe the chute bottom column if contact with the ground.If the bottom of the column touches the ground, should push the slide valve rod, upward ramp.
4, according to the requirements of the job, can promote the rocker stem, make big arm swinging, adjusted to the desired location;
5, after adjust position, should push the slide valve rod, make the slide downward slide, insert the chute bottom pillar on the ground.After all adjustments according to the pile work.

四、按桩工作
1
、推动钻杆上下阀杆,将锤头提升至最高位置;
2
、将矩形桩放入桩杆支撑内部,矩形桩放置稳定后,推动锤头阀杆,使锤头开始冲击工作。慢慢推动钻杆阀杆,使锤头慢慢向下移动,使桩帽插入矩形桩内部。
3
、锤头正常冲击工作情况下,慢慢向下推动锤头,将矩形桩按入地面至要求深度。

Fourth, according to the pile work
1, the push rod up and down the stem, hammer head up to the highest position;
2, the rectangle pile into the rod support inside, rectangle pile placed after stability, promote hammer stem, make the impact hammer head began to work.Slowly push the drill stem, make the hammer head slowly moves down, the rectangular pile and pile cap insert inside.
3, hammer impact work normally, slowly push down hammerhead, rectangle pile in the ground to the required depth.

产品参数:

型号Model

HWZGX-390L

锤头型号  Hammer Model

390

钎杆直径Rod   Diameter /mm

0-400

双联齿轮泵压力  Duplex gear pump pressurempa

20

双联齿轮泵排量Duplex gear pump displacementml/r

40

液压系统压力hydraulic system pressurempa

20

整机重量  Overall Machine weight /T

5.8

柴油发动机diesel enginekw

80


旋转角度  rotation angle /°

360

旋转半径  rotation semi diameter/mm

1925

有效按桩行程  Effective press pile stroke/mm

0-3000

外形尺寸dimension(LXWXH)(长××高)/mm

4650×2150×2700

履带板track shoemm

350

行走马达总排量Walking motor total emissions   (ml/n)

1575

行走马达额定压力Walking   motor rated pressurempa

18

行走马达输出扭矩  walking motor output torquen.m

4300

行走马达转速walking   motor rotationr/min

50


恒旺厂家直销HWZGX-390L履带压桩机360°旋转压桩机

产品信息Product information

液压旋转按桩机,是我厂为了适应市场发展需要,拓宽施工领域所精心研发的一款机型,较轮式打桩机来讲,场地的适应性更强,作业面更宽。经过了大量的理论推敲和实地认证,目前各项技术指标均已达到业内产品相关标准,为规范操作,确保钻机正常运转,请操作人员务必按以下规程步骤进行操作

Hydraulic rotary press machine, in order to meet the needs of market development, this factory is broaden the research field of the construction of a model, the wheel driver, stronger adaptability, operation is more wide.After a great deal of theoretical elaboration and field certification, is currently the technical indicators have reached the industry product standards, to regulate the operation, ensure the normal working of drilling rig, please make sure that the operator steps to operate in accordance with the following procedures

一、启动前检查工作

1、检查发动机机油、液压系统液压油、柴油等的油位是否达到工作要求,如油位不足,应及时添加,防止工作中因缺油而导致设备异常;
2
、检查动力装置、行走部分、锤头、滑道、滑道支架等各主要机械部位螺栓连接是否有松动,及时紧固松动的螺栓,防止工作中发生意外;
3
、检查各液压油缸、转动轴处的开口销是否正常,应及时更换磨损严重的开口销;
4
、仔细观察设备周圈环境,确保按桩机工作半径内无行人及障碍物。

First, before the start of inspection
1, check the engine oil and hydraulic system of hydraulic oil, diesel oil level whether meet the job requirements, such as the oil level is not enough, should be added in time, prevent work caused by lack of oil equipment abnormal;
2, check the power device, walking part, hammer head, slide, slide support the main mechanical parts such as bolts connection are loose, tighten bolt looseness, in time to prevent an accident at work;
3, check the hydraulic oil cylinder, the axis of rotation of the split pin is normal, should be timely replacement of worn split pin;
4, careful observation equipment circumferential environment, to ensure the pile machine working radius no pedestrians and obstacles.

二、启动发动机

 打开发动机组电源输出开关,旋转发动机钥匙,按下一键启动按钮,启动柴油机组。液压泵随发动机开始工作,怠速运转3~5分钟,逐渐加大供油量,使液压泵达到额定压力20Mpa,并固定好油门调节手柄。

Second, start the engine
Open the engine unit output power switches, rotary engine key, a key to press the start button, to start the diesel generator.Hydraulic pump with the engine start working, idle running 3 ~ 5 minutes, gradually increasing oil, make the hydraulic pump to achieve the rated pressure 20 mpa, and fixed throttle regulating handle.

三、移机至工作位置

1、仔细查看换向阀操作指示牌中各操作杆所对应机能,并熟记在心。严禁胡乱推动操作阀杆。
2
、推动zuo轮行走、右轮行走阀杆,将设备移动至指定位置,并找好桩位。
3
、推动大臂阀杆,升起大臂,调整大臂角度,使大臂达到工作要求。升起大臂过程中,应时刻观察滑道底端立柱与地面是否接触。若底端立柱触及地面,应推动滑道阀杆,向上提升滑道。
4
、根据工作需要,可推动摇臂阀杆,使大臂左右摆动,调整至所需位置;
5
、调整好位置后,应推动滑道阀杆,使滑道向下滑动,将滑道底端立柱插入地面。全部调整完毕后开始按桩工作。

Third, moving to the working position
1, take a closer look at the reversing valve operation sign by the lever of the corresponding function, and remember in mind.It is forbidden to careless driving operation of valve stem.
2, promote zuo round to walk, walk right wheel stem, move the equipment to the specified location, and find good pile location.
3, promoting stem, large arm raised arm, adjust the Angle of the big arm, arm can meet the job requirements.Rise in the process of the big arm, at all times observe the chute bottom column if contact with the ground.If the bottom of the column touches the ground, should push the slide valve rod, upward ramp.
4, according to the requirements of the job, can promote the rocker stem, make big arm swinging, adjusted to the desired location;
5, after adjust position, should push the slide valve rod, make the slide downward slide, insert the chute bottom pillar on the ground.After all adjustments according to the pile work.

四、按桩工作
1
、推动钻杆上下阀杆,将锤头提升至最高位置;
2
、将矩形桩放入桩杆支撑内部,矩形桩放置稳定后,推动锤头阀杆,使锤头开始冲击工作。慢慢推动钻杆阀杆,使锤头慢慢向下移动,使桩帽插入矩形桩内部。
3
、锤头正常冲击工作情况下,慢慢向下推动锤头,将矩形桩按入地面至要求深度。

Fourth, according to the pile work
1, the push rod up and down the stem, hammer head up to the highest position;
2, the rectangle pile into the rod support inside, rectangle pile placed after stability, promote hammer stem, make the impact hammer head began to work.Slowly push the drill stem, make the hammer head slowly moves down, the rectangular pile and pile cap insert inside.
3, hammer impact work normally, slowly push down hammerhead, rectangle pile in the ground to the required depth.

产品参数:

型号Model

HWZGX-390L

锤头型号  Hammer Model

390

钎杆直径Rod   Diameter /mm

0-400

双联齿轮泵压力  Duplex gear pump pressurempa

20

双联齿轮泵排量Duplex gear pump displacementml/r

40

液压系统压力hydraulic system pressurempa

20

整机重量  Overall Machine weight /T

5.8

柴油发动机diesel enginekw

80


旋转角度  rotation angle /°

360

旋转半径  rotation semi diameter/mm

1925

有效按桩行程  Effective press pile stroke/mm

0-3000

外形尺寸dimension(LXWXH)(长××高)/mm

4650×2150×2700

履带板track shoemm

350

行走马达总排量Walking motor total emissions   (ml/n)

1575

行走马达额定压力Walking   motor rated pressurempa

18

行走马达输出扭矩  walking motor output torquen.m

4300

行走马达转速walking   motor rotationr/min

50


相关产品推荐